The second half of October was so busy getting ready for my first solo show at Laerk Space that I failed to write much for this memorial at all. The following is the chronicle for November. At the beginning of Nov once the show was over I went on to make commemorative works and gave one to the gallerist. The other I got framed using a frame from a work in the show that didn’t sell and put it on my wall above my desk. I recycled a lot of the frames from the show, using ones from works that didn’t sell for other works that I hadn’t yet exhibited.
The above photo shows Adelaide with Henri (not shown by request apart from his hands) in the Yokohama house on 13 Nov but the memorial for November is almost empty. I talk a lot with my daughter when we manage to link up but I don’t remember what we talked about on this day and didn’t make a note of the conversation. We probably talked as usual about little Henri. I talk with them when they’re not too tired, but there’s so much work to do with an infant that it’s not always that they have time to chat.
The following photos show the solo exhibition at Laerk Space. I actually used many of these photos on the Esag blog but decided to add them here additionally for completeness. I’m nothing if not thorough, and I guess I thought that the show warranted more exposure as it was such an important and affirming experience for me.
Anther thing that happened in November, in fact late in the month so almost in Dec, was my commissioning Think Renewables to put in solar panels. A guy came around canvassing households and rang my doorbell. When I answered I got to talking with him. Later he had another guy come to go through the numbers, explain the process. After that I signed a contract and Think Renewables called me to organise a site visit by an installer. They consulted with Ausgrid about voltage and the technician came on the last day of spring to scope out the installation site, he went up a ladder to peer at the roof, went down to the basement to see where the inverter would go, and went into the light well to check out where the cabling for the electrics would be put to bring the power down from the roof to the garage.
No comments:
Post a Comment